Working with, in and around other lighting, electrical, seating and sound check teams and their equipment/cranes/scissor lifts throughout the entire process (400+ stairs and 1,600 sy of carpet throughout the theater). The tight construction schedule required all trades to be in there working at the same time, encouraging close-proximity teamwork to get the job done.