Most Aggressive Timeline / Schedule

Photos by: McShane Fleming Studios

Flooring Resources Corporation

Design by CannonDesign

Evanston, IL
8/31/2023

Details:

This job was a complete success despite the aggressive timeline. Our schedule was August 18th to August 31st. Within that time we ordered, received, inspected, and installed 875 SY of custom Bentley carpet, Tarkett stair nosings, and Johnsonite base. Although there were hurdles with nosing installation, the FRC team overcame the obstacles and installed all the material on time. The office and field worked together to get everything needed on site quickly and efficiently. The field team worked diligently to get the work done on a very tight timeline. The GC and the customer were blown away with how great the final installation looks.