Del Lago Resort & Casino

Best in Show

Photos by: Josh Reinhard

GP Flooring Solutions

Design by The Friedmutter Group

Waterloo, NY
8/1/2017

Details:

The Del Lago Resort &Casino was a high-profile project in upstate New York. The job consisted of 17,000 square yards of both Ulster Mills Axminster carpet and Leggett and Platt pad; 40,000 square feet of Armstrong VCT; 30,000 linear feet of Johnsonite millwork base; 3,000 square yards of Durkan hospitality broadloom carpet; 11,000 square yards of carpet tile (Mohawk, Bentley, and Milliken); 2,000 square feet of Mannington LVT; and 1,250 square feet of sports flooring. We were supposed to start in July of 2016, but they weren't ready for us to start until mid-October. The casino opened on time -- on February 1st -- which they have attributed in large part to the work of GP Flooring Solutions (see below testimonial). The hotel opened shortly thereafter, as planned. We accomplished this feat by having in-depth schedule meetings twice a week using our detailed phasing plan, which allowed them to continue executing with other trades. We were nimble and collaborative -- literally as soon as we had a roll of carpet installed, they were installing slot machine bases on top of it. Being squeezed in at the very end of the project, we had to allocate more resources and work weekends and overtime to meet their schedule. We also had to be really strategic in our approach. TESTIMONIAL: “I personally oversaw the construction of the Del Lago Resort & Casino project, and I am a partner in Del Lago. GP Flooring Solutions held the contract for all carpeting and B.O.H. VCT tile for both the Del Lago casino and the hotel. I can assure you that GP Flooring out performed any expectations we had for a flooring contractor, and I would highly recommend them. They were easy to work with, flexible and they reacted quickly. They understand how to install high-end carpet, how to keep to a fast-pace schedule, and they understand and have worked in casinos before. Our schedule from groundbreaking to opening was a 14-month schedule and as with most projects of this nature, the project came down to the wire. I don’t believe we would have opened on time if we had used a different flooring contractor." ~ Jim McKenna, Vice President of Construction, Wilmorite Construction, LLC. MATERIALS: Axminster Carpet, vinyl composition tile (VCT), carpet tile, rolled carpet, and luxury vinyl tile (LVT).

Suppliers:

Johnsonite
Armstrong
Leggett & Platt