Signature Flooring, Inc.
Design by SmithGroup
Los Angeles, CA
August 2021
Details:
Los Angeles – Sunset Medical Office Building
Los Angeles, CA
Architect – SmithGroup
Project Size: 48,000 SF
Details: Medical TI Renovation
Completed: 2021
Category: Tough Site Condition
Renovating three floors of an active medical office building that doesn’t have the ability to shut down. Procuring materials from 6 different manufacturers over 11 different styles / colorways during global supply shortage challenges and fast turnaround time. Keeping installation teams safe as well as maintaining a clean environment for patients who could have pre-existing conditions and or Covid illness. The owner of the medical office building, who cannot be named due to not-for-profit status, doesn’t deviate too often from contractor pool however can be very demanding in terms of schedule and expectations.
Manufactures Used:
Tarkett – Linoleum (Fuse)
Tarkett – Baseworks TS Rubber Base (Fuse)
UpoFloor PVC Free Sheet (Kahrs) (Fuse)
Shaw Carpet Tile / Shaw PVC Free Sheet / Nora Rubber / Sika Underlayments
Suppliers:
Tarkett Linoleum
UpoFloor
Tarkett Rubber Base