Making Waves Foundation

Most Maximized Budget, Toughest Site Conditions

Photos by: Pat Sandomenico

Flooring Solutions Inc.

Design by None - This was an FSI specified job

Richmond, CA
August 2018

Details:

Most Maximized Budget

Since 1989, Making Waves Foundation has provided educational opportunities that change young lives. Today, Making Waves remains committed to providing historically underserved and underrepresented students access to an equitable education that will propel them to a successful and rewarding future. This was an FSI specified job. We had the ability to use Karndean's beautiful designs and provide the customer with a product that was affordable and within their budget. We were also able to provide them a product that has a superior commercial grade quality and warranty. Since those installs were completed, we have secured 3 additional buildings to complete in 2019.

Toughest Site Conditions

Since 1989, Making Waves Foundation has provided educational opportunities that change young lives. Today, Making Waves remains committed to providing historically underserved and underrepresented students access to an equitable education that will propel them to a successful and rewarding future. We completed 2 buildings on their campus in 2018 with over 11K square feet of LVT installed. We ripped out old glue down carpet throughout both buildings on multiple levels. We needed to use a crane to bring the LVT materials to the second floor for installation. We used Ardex feather finish and a high moisture XL Brand adhesive throughout the buildings under the LVT.

Suppliers:

Karndean
XL Brands
Ardex