Tomball ISD New Early Excellence Academy

Toughest Site Conditions

Photos by: Bruce Glass

Intex Flooring

Design by DLR Group

Tomball, TX
9/5/23

Details:

400 Unit, Six Section, 4 story Apartment Complex with separate club house. 13,100 sy of carpet, 155,843 SF of LVT, and 52,452 SF of Tile. Project Overview: This project involved flooring installation across multiple buildings in a large apartment complex. After completing two buildings, we discovered a material failure with the specified product (dimensional instability) that jeopardized the flooring’s performance and integrity. Challenge Faced: We immediately sent the flooring for testing, which confirmed that the material was unsuitable for the project. This required switching to a different product, causing a three-week delay. Solution Implemented: We worked closely with the general contractor and client to quickly identify and implement a proven, reliable alternative. Despite the delay, we adjusted schedules, mobilized our labor force, and kept the project on track. Outcome: • Quick Decision-Making: Testing confirmed the material issue, allowing us to switch to a trusted product without further complications. • Adaptability: We overcame the three-week delay by adjusting our team’s schedule and resources to meet the revised timeline. • Collaboration: Open communication with the client and GC ensured a smooth transition and kept everyone informed. • Successful Completion: The project was completed on time with the new flooring, meeting quality and durability standards. Conclusion: This project highlights our ability to quickly resolve unexpected issues, adapt under pressure, and deliver a successful result, making it a strong candidate for the Toughest Site Conditions Award.

Suppliers:

Tarkett
Mapei
Roppe